以太坊单双游戏:KPower gets four-year PPA extension

admin 1个月前 (08-25) 社会 4 0

以太坊单双游戏www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,以太坊单双游戏数据开源、公平、无任何作弊可能性。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

欧博网址:(www.aLLbet8.vip),欧博网址开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。
Sunbet声明:该文看法仅代表作者自己,与本平台无关。转载请注明:以太坊单双游戏:KPower gets four-year PPA extension

网友评论

  • (*)

最新评论

文章归档

站点信息

  • 文章总数:9537
  • 页面总数:0
  • 分类总数:8
  • 标签总数:2050
  • 评论总数:5429
  • 浏览总数:589027